The revision the site manager sent at 21:40 becomes a project document.
Integrations
Nobody is going to re-upload a project. Brickato connects to the places drawings, contracts and offers already arrive, so the cross-check runs on what your team actually sent each other.
None of these inbound connections is live to demo today. Upload files into the project now. We mark a connector Live only when you can point at a folder, inbox, or budget tree and see it in the workspace.
The revision the site manager sent at 21:40 becomes a project document.
Forward a tender package and it lands parsed, not as an attachment nobody opens.
Point at a project folder and keep it in sync.
Choose which folders sync, leave the rest alone.
Same folder your subcontractors already share with you.
Match BOQ items to budget lines and actual cost.
Revisions arrive with their drawing number and revision intact.
Push documents in, pull findings and citations out.
Comparison grids to Excel, findings to your own reporting.
When a source is connected, every file is cited like any other document, so an answer grounded in that file shows you the file, at that page, with the same drawn box.